Join our award-winning team today! Click here  to find out more information on our vacancies or speak with our team on 0151 530 5454

Morris Meadows

Our team of specialists erected a bespoke scaffold design for Sovini Construction’s timber frame apartment block on their largest social housing development to date.

Teal Scaffold delivered a bespoke access solution to support on Sovini Construction’s largest development to date. The development hosts a total of 145 homes inclusive of one, two, three and four bed houses as well as an apartment block home to 58 flats.

The apartment block freestanding scaffold was erected to support the modernised timber frame construction. Our team created a safe, compliant structure with multiple configurations and additional safety precautions which enabled multiple tradesmen to work at height safely.

As the perimeter of the scaffold was 280m the tube and fit solution was erected in four lifts to coincide with the build requirements and floor height. Logical and straight forward access for the construction team was provided  The bespoke design solution included staircase and loading bay adaptions for numerous specialist tradesmen.

External to the apartment block we created progressive scaffolding to allow bricklayers to construct each tier of the building and contractors to build the roofs.

Our team installed comprehensive work platforms at the required levels and a blocking lift scaffold up to roof level to complete any plastering, truss, and tiling work.

Steve Parrington, Managing Director shared: “As proud partners of The Sovini Group we are delighted to be able to utilise the Group’s full supply chain. We have previously witnessed Teal Scaffold’s expertise and industry knowledge first hand, so it was a no-brainer to bring them aboard for this major project with us. The work they have delivered on this project has been excellent”.